Answered: NEC PSC: Entitlement with delayed planning approval?

$
0
0
If you are certain that (1) the event wasn't due to an instruction from the Employer etc (see clause 61.1) and (2) that it has been more than 8 weeks since the Consultant was aware of the event (see clause 61.3), then the Consultant is no longer entitled to a compensation event.