NEC ECC: Change of scope

$
0
0
If the Contractor communicates a change to the scope with the client and carries out the work at a lot of extra cost and later when putting in a claim for the extra time and cost, the PM states that no early warning was received, the contractor then says it were diacuased and agreed by the PM. can this be considered an inducement  and therefore an act of corruption because it has been an advantage to the Client?