Answered: NEC ECS: Under ECS Option A how do you evaluate a descope?

$
0
0
Not ask, but instruct ! (under clause 60.1(1))

You should notify a compensation event at the same time.

The Subcontractor should then give a quotation in accordance with the clause in sub-section 63. A reduction in scope is one of the few compensation events that can result in a negative compensation event for the Prices.