NEC ECC: Contractor's Design is a Higher Spec than the Works Information

$
0
0
If the Contractors Works Information states a superior system to the Employers Works Information such as more sophisticated item of M & E.  Upon the Project Manager asking the Employer what preference they have, the Employer has asked for the item within the Contractors Works Information. Is this a change to the Employers Works Information so a CE, or is this a case where the Employer gets to chose the better product as it is considered to be allowed for anyway so not a CE?