NEC4 ECC: Title to Materials

$
0
0
In the NEC4 ECC the Scope states that an existing structure is to be demolished. Does the Contractor or the Employer have title to the material?

Some materials, say lead or copper may contain residual value, therefore profit can be made from their resale; in the NEC4 ECC who does these materials belong too?