Answered: NEC3 ECC: Costs for quotations under NEC PSC Option C

$
0
0
Under option A the cost of producing CE quotations is excluded (62.7). The same clause does not exist under option C, therefore the cost of producing quotations is NOT excluded and can be included within the CE quotation.