Answered: NEC ECSC: Design liability under Short Subcontract

$
0
0
The ECSS is not intended to be used for the hire of temporary works and it doesn't deal with design liability at all so I'm not convinced you are using the right contract and without amendment with additional conditions of contract it isn't fit for this purpose.