NEC ECC: Can I ask to see the Subcontractor rates when assessing a CE?

$
0
0
When assessing a CE, can I ask to see the Main Contractors, subcontractor contract to ensure the rates are as agreed between the two parties and to ensure that the main contractor isn't inflating the rate to skim off the top?