NEC ECC: Concerns that the Contractor’s design of the lift installation appears to be inadequate and sub-par.

$
0
0
Under an option A NEC3 contract its a design and build the Contractor's design of the lift installation seem to be below par. Other than giving him a early warning notice is their any other alternatives?