NEC3 ECC option C. We are using excavators and dumper trucks on site which are clearly recoverable under equipment of the SCC. What about the fuel that we are using to run the machines? Where under the SCC does it state that is recoverable, as I have a Project Manager who says that is not recoverable and should be included within the fee.
↧