NEC3 Short Form - Incorrect description in BOQ

$
0
0
We are a contractor working under the NEC Short Contract who were provided a bill to price by the employer at tender stage.

The bill has not been measured in accordance with any method of measurement.

There is an item for saw cutting which is described as ''Saw cut reinforced concrete slab to a depth not exceeding 150mm'.

However we have had to saw cut the depth of slab (400mm).

Can this additional saw cut depth be claimed as a compensation event?