NEC ECS: Supplier design fee - is this recoverable as part of a compensation event?

$
0
0
In NEC3 ECS option A, a variation is issued to a Subcontractor. The Subcontractor then passes the design and manufacture of the variation to their Supplier who is under a supply agreement.

Does the design carried out by the Supplier attract the design fee in the Data Part 2?

And as the Supplier is not classed as a Subcontractor this variation does not attract the Subcontract fee in the DP2, but does however attract direct fee as it is a supply agreement.

To note, the Subcontractor only carried out the installation of the variation.