We do have X2 as a secondary option and there has been a law change due to Corona virus. However, the Z clauses have deleted 60.1(19) and the Project Manager is saying we can't claim a conference for Coronvirus with 60.1(19) deleted.
What can the Contractor claim for in this situation?