Answered: NEC3 ECC: Can the (a) Project Manager delegate his authority ad infinitum?

$
0
0
Antonia - I don't think you need to worry too much who they are delegating to, just who is authorized under the contract. If it ends up being the tea boy (or girl) as well then so be it. You just need to know who is authorized to give instructions and that is their call as to who is suitable/experienced.  

Don't forget delegation is as well as, not instead of. The original PM is not giving up their own power, just spreading it. Whenever they are back they will instantly have the same power than before they left.

I hope the PM had a  really good holiday, as it sounds like they are going to be busy when they get back!