It depends what is said in the Works Information/Scope.
If the Contractor is required to simply demolish the building and leave the remains on site (which seems unlikely if construction of a new building is required) then the materials have to be left on site at wherever the WI/Scope says they are to be left.
If the Contractor is required to remove the remains of the old structure from site then, unless the WI/Scope specified what is to be done with them, it's entirely up to the Contractor whether those remains go to landfill, are recycled, or are sold on for re-use.
If the Contractor is required to simply demolish the building and leave the remains on site (which seems unlikely if construction of a new building is required) then the materials have to be left on site at wherever the WI/Scope says they are to be left.
If the Contractor is required to remove the remains of the old structure from site then, unless the WI/Scope specified what is to be done with them, it's entirely up to the Contractor whether those remains go to landfill, are recycled, or are sold on for re-use.