Answered: NEC3 ECC: PM assumption under 61.6 was wrong but they do not state a correction – what happens next?

$
0
0
You are right, if a PM stated assumptions has been proven to be incorrect the PM is obliged to notify of a compensation event under 60.1(17).

If you have notified the PM under 61.3 that you believe a compensation event is expected to happen then the PM is obliged to notify you that either the matter is a compensation event or not.

If the PM has notified you that the matter, his assumption being wrong, is not a compensation event then you will need to consider how to progress the matter.