The main contractor submits a CE Quotation for work which is completely subcontracted out. The quote contains;
Breakdown of Costs (from the s/c)
20% OH&P (which was added by the s/c)
The main Contractor has then added 6% Subcontracted Fee and 6% Direct Fee.
Is this correct?
Breakdown of Costs (from the s/c)
20% OH&P (which was added by the s/c)
The main Contractor has then added 6% Subcontracted Fee and 6% Direct Fee.
Is this correct?