NEC ECC: Can the Contractor introduce new items to revised quotations?

$
0
0
Whilst going through revised quotations for an accepted CE and challenging the Contractor over the build-up / substantiation of their quotation the Contractor has included new items not previously submitted.

Is this acceptable if found to be genuine or can it be rejected on the basis that the costs were not claimed for in previously submitted quotations?