NEC ECC: Who pays cost of preparing a Contractor's proposal?

$
0
0
If a PMI is raised requesting a Contractor's Proposal, is the Employer liable to pay the costs for the contractor to produce the proposal. (Contract is NEC3 ECC with standard SCAPE amendments)

The Contractor is claiming for design costs in developing a Contractor's Proposal.