We tendered a project to unapproved construction drawings. As the detail filtered in throughout the project, inevitably variations did also.
The stance the Client is taking is that, as a reasonably experienced Contractor we should have expected to provide these items at what they deem suitable specifiations.
From a contractual/legal perspective, if an item wasn't shown on tender drawings or referenced in our tender information, then is it a compensation event whether the item turned out to be necessary or not?