Answered: NEC ECC: Accepting Defects - Clause 44.2

1. Quotation for proposal not to rectify a defect should be in writing (13.1) and separate from any other communication (13.7) 2. PM should decide if the quotation is enough of a saving and worthwhile...

View Article


Answered: NEC3 - Can Contractor Proposed Value Engineering cost more than the...

I am not sure how you are administering this matter under the contract, although I presume that the Contractor's proposal was formally confirmed as an instruction by the PM to change the Works...

View Article


NEC ECC: When is the Contractor entitled to a direct fee and when is a...

What is the difference between P&G's, and direct fee?

View Article

NEC ECC: Option B. is Contractor entitled to direct fee on substituted work...

If there was an item in the BOQ for supply and install swing gate, and the contractor priced for this item, now the Employer is changing the swing gate to sliding gate, do we still have to pay for...

View Article

NEC ECSC: Short Form, omission of works

We are currently carrying out a refurbishment contract under the NEC3 Short Contract (2013). The contract drawings are weak and the pricing schedule is also a poor document. The pricing schedule does...

View Article


NEC ECC: Uncorrected defects 45

With regards to the timing for exercising clause 45 - Uncorrected defects If a notified defect has not been completed by the end of the period stated in Contract Data part 1 for the defects corrections...

View Article

Answered: NEC ECC: Uncorrected defects 45

Provided appropriate access was given in order to correct the Defect, then the PM can take action under clause 45 following the expiry of the appropriate defects correction period. To initiate...

View Article

Answered: NEC PSC: Option E - Contractually, what is the best way(s) to...

It sounds like you have already considered the appropriate contract mechanisms, which are usually best used by applying a mix of incentives and disincentives, rather than just focusing on one or the...

View Article


Answered: NEC3 ECC Negative Compensation Event Impact on Programme

The Contractor is correct, de-scoping works will reduce Defined Cost but not affect the Completion Date, it's up to the Contractor to choose how he uses the time, he can choose to finish earlier and...

View Article


Answered: NEC3 Contract Programme - Half the scope

There is no such thing as deemed acceptance of the programme in NEC3, it simply doesn't exist. There is only deemed acceptance of compensation event notifications and quotations and only then when this...

View Article

Answered: Is it critical for Z clauses to be noted in CDP1 S1 General fist...

There is no issue with the first bullet point, that's exactly all it's supposed to do is summarise the contractual framework by listing the main and secondary options plus the version of the contract....

View Article

Answered: Is it critical for Z clauses to be noted in CDP1 S1 General fist...

If it is not listed in first line of contract data (although it should be) you still cant say they don't exist if they are part of the bound signed contract.n It is a bit like if they dont list X7, but...

View Article

NEC ECC: Option E, can the fee be changed if turnover is not what was expected?

On an option E contract our client has a clause that entitles them to audit the agreed rates, if the effect of the audit results in the rates being reduced this would then reduce the company turnover,...

View Article


Answered: NEC ECC: When is the Contractor entitled to a direct fee and when...

Just to add to QS007's comment above, As well as including for P&G type costs, the direct fee also includes head office overheads and any other cost not included in the Schedules of Cost Components.

View Article

Answered: NEC ECC: Option E, can the fee be changed if turnover is not what...

If the Client has the right to audit any rates and they are found to not be compliant with the contract, presumably the Schedule of Cost Components, then they may also have the right to 'change' them,...

View Article


Answered: NEC ECC: BoQ items doubled up?

Two ways of looking at it.... (i) 11.2(30) defines the PWDD as the quantity of work completed for each item in the Bill multiplied by the rate. So using your example of sub-base for backfill of...

View Article

Answered: NEC ECC - payment inspection

The Project Manager has the right to inspect accounts and records as provided by clause 52.3 of the cost reimbursable main options C, D and E, although the PM may  also delegate this right under the...

View Article


Answered: NEC ECC: Option B. is Contractor entitled to direct fee on...

You price the change on the basis of deducting the defined cost of the omitted work, plus fee, and then adding back the defined cost of the additional work, plus fee. If the sliding gate costs more...

View Article

NEC ECC: Is it possible to use ECI with same Contractor moving onto ECC...

Intended the main Contractor will assist designer before build under an NEC3 ECC Option A.  NEC3 ECI only appears to be applicable if contractor then engaged under an NEC3 ECC Options C and E?

View Article

NEC ECC - Unapproved Drawing Changes

We tendered a project to unapproved construction drawings. As the detail filtered in throughout the project, inevitably variations did also. The stance the Client is taking is that, as a reasonably...

View Article