Under NEC Option C, can the contractor include a risk allowance for quantities even when they themselves have produced the design and drawings ? If so how can the two parties determine what is acceptable, ie 5% additional quantities ? Should each quantity risk allowance included in the Target Cost be specifically referenced in the risk register and priced ?
↧